皇冠注册平台,皇冠体育注册平台,皇冠开户,皇冠正网,皇冠正网开户,皇冠官网,皇冠官网开户,皇冠现金网,皇冠现金网开户,皇冠信用网,皇冠信用网开户,皇冠体育,皇冠体育开户,皇冠体育网址,皇冠体育官网,皇冠体育官网开户

首页社会正文

手机新2管理端(www.99cx.vip):TNB, PETRONAS to collaborate on joint feasibility studies on hydrogen and carbon capture

admin2022-08-282

手机新2管理端www.99cx.vip)实时更新发布最新最快最有效的手机新2管理端网址,包括新2手机网址,新2备用网址,皇冠最新网址,新2足球网址,新2网址大全。

KUALA LUMPUR: Tenaga Nasional Bhd (TNB) intends to work with Petroliam Nasional Bhd (Petronas) on joint feasibility studies in the areas of hydrogen and carbon capture with a view to unlocking the commercial value of at least RM10 billion up to 2035, said TNB president and chief executive officer Datuk Baharin Din today.

The decarbonisation efforts would be achieved mainly through a collaborative study to develop a green hydrogen ecosystem and carbon capture and storage (CCS) technology, leveraging both organisations' technical expertise and resources.

In addition, the two companies will repower the retired combined-cycle gas-fired power plant, the Sultan Ismail Power Station (SIPS) in Paka, Terengganu by using gas with hydrogen-ready technology, said Baharin in a statement today.

TNB will be investing RM6.3 billion in the repowering of SIPS using high-efficient Combined Cycle Gas Turbine (CCGT) with hydrogen-ready technology for cleaner energy production.

Baharin said the repowering of the plant will leverage the strengths of both TNB and Petronas; and will serve as a unique pioneering project in deploying green technologies that may be utilised in future power plants.

"This brownfield project will start with the demolition of the existing plant next year and this will take two years. Construction of the project will commence from 2025 and the entire complex is scheduled to be ready in 2030,” he added.

,

环球ug代理www.ugbet.us)开放环球UG代理登录网址、会员登录网址、环球UG会员注册、环球UG代理开户申请、环球UG电脑客户端、环球UG手机版下载等业务。

,

Upon commercial operation of the plant in 2030, the repowered Paka is projected to generate an average of RM250 million per year in earnings before interest and taxes.

"The repowering of Paka, with a capacity of 1,400 megawatts (MW) will avoid 3.2 million tonnes of carbon dioxide equivalent emission per annum, which is equivalent to the CO2 emitted by approximately 700,000 cars each year,” said Baharin.

As the country’s leading energy corporations, Baharin said TNB and Petronas have been forging cooperation for decades in the development of the energy sector and the betterment of the country.

Both TNB and Petronas have signed a memorandum of understanding (MoU) inked by both on Aug 19 to strengthen collaboration in driving innovative solutions toward decarbonisation, making it a historical milestone in supporting Malaysia’s aspiration to be a carbon-neutral nation by 2050.

"The MoU signals the recognition that our paths must converge, in order to realise a successful and inclusive energy transition for Malaysia. TNB has identified two technologies that will bring sustainable decarbonisation to our thermal assets and these are green hydrogen and carbon capture technologies,” said Baharin.

He added that TNB’s MoU with Petronas formed part of TNB’s accelerated Responsible Energy Transition, which is driven by Petronas' aspiration to be net zero by 2050 and the TNB’s target to reduce its coal capacity by 50 per cent and carbon emission intensity by 35 per cent in 2035.

网友评论

最新评论